← Back to list
Registration: 29.04.2025

Leonardo Savickas

Specialization: Electrical Engineer
— I am someone who works to achieve a safer environment for everyone whom I am associated with. — Helpful team player, a hands-on engineer to propel a team poised for innovation.
— I am someone who works to achieve a safer environment for everyone whom I am associated with. — Helpful team player, a hands-on engineer to propel a team poised for innovation.

Skills

PLC
Manufacturing Engineering
Electrical Engineering
PCB Design

Work experience

Sr. Electrical Engineer
since 05.2017 - Till the present day |Safran
Electrical Engineering, PLC, Manufacturing Engineering
● Manage all Electrical for Capital Projects. ● Managed the design and purchase of new 4MV Substation Sleds $8.0MM. ● Managed the design and purchase of new Control Car Sleds $12.0MM. ● Managed the design and purchase of new VFD Sleds $6.0MM. ● Managed the Electrical Upgrade for a new Ammonia Storage Plant. ● Managed the Installation of several new VFD’s. ● Managed the Upgrade of a new Power Line feed. ● Managed the design and Upgrade of the Controls for a Liming Station controls Upgrade.
Lead Electrical Engineer
since 06.2012 - Till the present day |Serco
Power Distribution, Data Acquisitions
● Electrical Lead for Three mines. (Salt, Sulfate of Potash and Magnesium Chloride production). ● Electrical Project Manager for Expense and Capital Projects. ● Manage Capital Projects. ● Manage Power Usage and Power Distribution. ● Manage Instrumentation and Controls Systems. ● Manage System Controls and Data Acquisitions.
Electrical Project Manager
04.2009 - 08.2012 |Georgia-Pacific
Power Distribution, Data Acquisitions
● Managed Capital Projects with cost range from $40M to $10MM. ● Managed the Project and installation of all new lighting system for the Converting Area. ● Managed the Electrical Project and Installation of a New Broke System. ● Managed the Project and installation of two Chill Water Systems and New Air Wash system. ● Managed the installation of a new Package System including two Elettric 80 Robots Stretch Wrappers and two Unitizers.
Electrical Project Manager
09.2000 - 04.2009 |Meggitt
Electrical Design, Control System Program, Manufacturing Engineering
● Power Distribution, Motor Control Center Installations. ● Developed Dust Control System Program and Electrical Design. ● Filter Press Electrical Design and Program. ● Designed Code Dater Installation. ● Designed K5 to MF3 & MF4 Communications Upgrade. ● Designed MF4 Conveyor Upgrade. ● Converted Automax Ladder Logic to Logic Diagrams.

Educational background

Electrical
1995 - 1999
University

Languages

EnglishNative